Wednesday, October 15, 2014

Renovation.. Unsteady Progress

A few weeks into June, with nothing other than a new wall accomplished, I admitted to myself that having the room ready for July summer classes was a bit ambitious.  Could we have held classes with a boombox on the carpet?  Sure.  Was that the first impression of the new and exciting space I wanted to give my clients. Uh, absolutely not.

So, onto painting.  But wait!  First the other studio location has to have a pipe burst!  And flood the entire space!  And ruin lots of things!  And require insurance inspectors and summer camp last-minute changes and new rugs and potentially ruined marley!  Because chaos!

::deep breath::

So that was a fun weekend of clean-up and tears and then realizing that a pipe bursting during summer and destroying a bunch of old costumes is not the worst thing in the world, even if it is inconvenient and a pain to clean up (imagine if it happened a week before recital and ruined THOSE costumes?!).  It is also just a bit disconcerting to find your entire space covered in water.




But, back to the matter at hand - oh yeah, I was supposed to be painting, not mopping up water.

And look, a new window!


It turned out, when picking out window sizes that this size was the best one to go with because any bigger was a big jump in expense. 


Making progress...

To Do List
X Connect spaces
X Build waiting room wall
X Waiting room window
X Paint waiting room
X Paint dance room
- Install dance floor
- Furnish waiting room
- Buy sound system
- Ballet barres in dance room
- Order and install mirrors

Next up... flooring!

Sunday, October 12, 2014

The Renovation Begins...

So the first task in the New Space, was to connect the new space to the old space.

A refresher on what we are trying to accomplish:

So I began renting the space in June with the very, very VERY optimistic goal (did I mention VERY optimistic) of having it ready in time for July summer classes.

My contractor and I went over what I wanted and he gave suggestions and little tweaks that made more sense with things like electrical outlets and windows and building code.

And then on June 2 (five days before our end of year recital) the work began!

It was amazing how quickly the wall went up - they framed it out and had the sheetrock up in no time.  The hole is for the observation window eventually.



Looking through the "window" into the dance room.


And connecting the two space (new space is purple, existing studio is beige).




Ahhh!  I don't know why, but when I saw this, I started getting super excited!  It's real, it's real!



Looking back through at the narrow waiting room.


So that was pretty much it with the professional help other than the mirrors and window installation, the rest is on me and my husband!

To Do List
X Connect spaces
X Build waiting room wall
- Waiting room window
- Paint waiting room
- Paint dance room
- Install dance floor
- Furnish waiting room
- Buy sound system
- Ballet barres in dance room
- Order and install mirrors

Next up... painting!